the reason why the crusher is slow to discharge

Home / the reason why the crusher is slow to discharge

About Us

ATIEMAR Heavy Industry

Over the more than 30 years of experience

ATIEMAR Heavy Industry which mainly manufacture large and medium-sized crushing and grinding equipments was founded in 1987. It is a modern joint-stock corporation with research, manufacturing and sales together. The Headquarter is located in HI-TECH Industry Development Zone of Zhengzhou and covers 80000 m ². Another workshop in Shangjie Industry Park covers 67000 m ².

689+

Manufacturing Machine

170+

Nations Services Covered

3200+

Number of Employees

Learn more

Our Services

We Provide all kinds Of Services


Workshop


Spare Parts


Project Design


Packing

Plan design
Gerneral Construction
Project Management
Maintaince

the reason why the crusher is slow to discharge

2020-10-21T19:10:24+00:00

  • The reason why the cone crusher has poor discharge

      The reason why the cone crusher has poor discharge quality Time: 09:49:48 Share To If you are looking for related products or have any other questions, do not hesitate to call our sales line or click on the right button to request a quote online

  • What is the reason for the slow feeding of jaw crusher

      When the jaw crusher encounters materials with large surface moisture, it is very easy to jam, and the ore will be blocked in the cavity after crushing, and the material will not come down or the material will be slow; or because the jaw crusher is crushing the material, there is mud mixed in, making the minerals unable to come down

  • Cause Jaw Crusher Is Less Than Expected

      The reason jaw crusher of the above analysis it is less than expected, in order to solve this problem, it is necessary to strictly control the nature of the materials or components of the material, the humidity of the material or which comprisesafter reentry remove foreign matter material, Then the speed of the feed, to ensure continuous and

  • Why is the cone crusher blockedJiaozuo zhongxin heavy

      The discharge speed is too slow or the discharge port is blocked In the production process of the cone crusher, the discharge speed of the material is too slow or the discharge port is blocked, which may cause the equipment to block the material In this way, a large amount of material is blocked in the crushing cavity, so that the crusher has

  • Jaw Crusher Working Principle

    EffectsPerformanceApplicationsAdvantagesRisksExampleFunctionVariationsPreparationMechanismCriticismsDetailsEtymologyConstructionDesignPhilosophyIt will be noted that the motion is a rocking one When the swing jaw is rising, it is opening, at the top, during the first half of the stroke, and closing during the second half, whereas the bottom of the jaw is closing during the entire upstroke A reversal of this motion occurs during the downstroke of the eccentric1metallurgist
  • HSE Quarries Safe operation and use of mobile jaw

      If, after careful examination, there appears to be no electrical or mechanical reason why the crusher has stalled, it may indicate that the crusher is jammed by tramp metal A "stalled crusher permit to work" system should be implemented This work

  • Streams and Drainage Systems Tulane University

      Discharge The stream channel is the conduit for water being carried by the stream The stream can continually adjust its channel shape and path as the amount of water passing through the channel changes The volume of water passing any point on a stream is called the discharge Discharge is measured in units of volume/time (m 3 /sec or ft 3 /sec)

  • Primary Crushing Mineral Processing Metallurgy

      A crusher of these dimensions will break 40 tons per hour to 2½in size with a power consumption of 30 hp On the other hand, a 14in gyratory crusher, working as it should at full capacity, will crush 100 tons per hour to the same size with a power

  • Capacitor Discharging Explained

    The discharge time which you'll need depends on the specific application for which the RC circuit is used for Capacitor Discharging Graph The Capacitor Discharging Graph is the a graph that shows how many time constants it takes for a capacitor to discharge

  • Discharge Hydrographs Geography AS

      The discharge of a river (or stream) is the volume of water that flows past a point in the river’s course per second The volume is measured in cubic metres (m 3) and it’s per second so the units of discharge are cubic metres a second or m 3 s1Coincidentally, 1m 3 s1 is the same as 1 cumec so the discharge of a river is often measured in cumecs because it’s a bit easier to say

  • Cause Jaw Crusher Is Less Than Expected

      The reason jaw crusher of the above analysis it is less than expected, in order to solve this problem, it is necessary to strictly control the nature of the materials or components of the material, the humidity of the material or which comprisesafter reentry remove foreign matter material, Then the speed of the feed, to ensure continuous and

  • HSE Quarries Safe operation and use of mobile jaw

      If, after careful examination, there appears to be no electrical or mechanical reason why the crusher has stalled, it may indicate that the crusher is jammed by tramp metal A "stalled crusher permit to work" system should be implemented This work

  • Primary Crushing Mineral Processing Metallurgy

      A crusher of these dimensions will break 40 tons per hour to 2½in size with a power consumption of 30 hp On the other hand, a 14in gyratory crusher, working as it should at full capacity, will crush 100 tons per hour to the same size with a power

  • The effect of mechanical–physical pretreatment on

      The output from each procedure (Residues A–C) was transferred to a hammer crusher (8 mm discharge grate) and to hammer mill (1 mm discharge grate) to yield fractions of −8 + 0 mm and of −1 + 0 mm grain size These two fractions of each residue were used for leaching experiments 23 Leaching experiments

  • Discharge Hydrographs Geography AS

      The discharge of a river (or stream) is the volume of water that flows past a point in the river’s course per second The volume is measured in cubic metres (m 3) and it’s per second so the units of discharge are cubic metres a second or m 3 s1Coincidentally, 1m 3 s1 is the same as 1 cumec so the discharge of a river is often measured in cumecs because it’s a bit easier to say

  • (PDF) Crushing and Screening Handbook Kevin Berrocal

    Crushing and Screening Handbook f MINERALS Metso Minerals in brief Whether you need a single crusher, a multi stage process or a complete plant, we assist you To be successful in today’s quarry and sand and with the right design for the most costefective gravel operations, you need a partner to sup crushing process

  • Capacitor Discharging Explained

    The discharge time which you'll need depends on the specific application for which the RC circuit is used for Capacitor Discharging Graph The Capacitor Discharging Graph is the a graph that shows how many time constants it takes for a capacitor to discharge to a given percentage of the applied voltage

  • Vaginal Discharge: Signs of Infection, Treatment and

    It is normal for women to have some vaginal discharge Normal vaginal discharge is thin like mucus and clear, white or slightly yellow It usually has no unpleasant odor and is not itchy or irritating Signs of infection include unpleasant odor, itching, burning and thick, white vaginal discharge

  • Discharge Planning ScienceDirect

      Discharge planning is an interdisciplinary approach to continuity of care and a process that includes identification, assessment, goal setting, planning, implementation, coordination, and evaluation Effective discharge planning supports the continuity of health care; it is described as “the critical link between treatment received in

  • Tips to improve PC performance in Windows

    One of the best ways to get the most out of your PC is to make sure you have the latest version of Windows 11 installed When you check for updates, your PC will also search for the latest device drivers, which can also help improve your PC’s performance

  • 12 tips to maximize cone crusher productivity Metso

      "Fines in the crusher feed" is defined as material entering the top of the crusher which is already equal to or smaller than the crusher's closedside discharge setting As a rule of thumb, the maximum number of fines in the crusher feed should not exceed 25 percent for secondary crushers or 10 percent for tertiary crushers

  • What can we do if a plastic granulator does not discharge?

      Why does a plastic pelletizer discharge slower? There are many reasons for the slow discharging, the first one is the low configuration of the pelletizing machine itself or the decrease in output after the screw and barrel are worn out If the screw feed port design is unreasonable, or there is debris in the barrel that is blocked, it will affect the machine's output

  • [PDF]
  • RESTRICTED Map Your Show

      Why crusher performance is dropping? RESTRICTED • Reduced capacity might be due to reduced crushing chamber = lower performance – In pedestal type cone crusher stroke increase is somewhat compensating the reducing chamber volume • One other reason can be poor wear profile • Need to pay attention on right crushing chamber selection

  • Primary Crushing Mineral Processing Metallurgy

      A crusher of these dimensions will break 40 tons per hour to 2½in size with a power consumption of 30 hp On the other hand, a 14in gyratory crusher, working as it should at full capacity, will crush 100 tons per hour to the same size with a power

  • (PDF) Crushing and Screening Handbook Kevin Berrocal

    Crushing and Screening Handbook f MINERALS Metso Minerals in brief Whether you need a single crusher, a multi stage process or a complete plant, we assist you To be successful in today’s quarry and sand and with the right design for the most costefective gravel operations, you need a partner to sup crushing process

  • Study of the wear behavior of limestone impact crusher

    The reason why the buttons on the edge of the bit are worn so terribly is analyzed The line speed of those buttons is much higher and causes a heavy abrasion which means the WC grains crush terribly

  • Vaginal Discharge: Signs of Infection, Treatment and

    It is normal for women to have some vaginal discharge Normal vaginal discharge is thin like mucus and clear, white or slightly yellow It usually has no unpleasant odor and is not itchy or irritating Signs of infection include unpleasant odor, itching, burning and thick, white vaginal discharge

  • Mineral Processing SlideShare

      Jaw crusher is the better choice because of: 1Jaw crusher can take larger size than gyratory is better adopted to handle clayey spongy rocks 2Gyartory crusher consume more power for the same feed as produces more new surfaces than

  • BU201: How does the Lead Acid Battery Work? Battery

    A discharge of 100% refers to a full discharge; 50% is half and 30% is a moderate discharge with 70% remaining Lead Acid or Liion in your Car? Ever since Cadillac introduced the starter motor in 12, lead acid batteries served well as battery of choice

  • White Creamy or Milky Discharge: What Does It Mean?

      The American Pregnancy Association, says that an increase in estrogen hormone levels causes the milky or creamy ovulation dischargeThis is also called egg white cervical mucus, or EWCM for shortThis whitish clear sticky discharge creates